What Demolition Cleanup Actually Involves
A note on hazardous materials first. WorkSafeBC requires a qualified asbestos survey before any demolition or renovation work on any Kelowna property built or renovated before 1990. This applies to a large portion of the city's housing stock including most homes in the North End, Glenmore, and Rutland. Nick does not handle asbestos, lead paint, or other hazardous materials. Once a certified abatement contractor has cleared the site, Nick hauls everything else. That handoff is exactly where Blue Door gets called and it is a clean, predictable arrangement that keeps the project moving without overlap.
For the non-hazardous material, Nick works through the load systematically. Wood goes where wood can be processed. Metal gets sorted for recycling. Concrete and masonry go to facilities that handle those materials. Mixed debris goes to disposal sites equipped for it. Nothing gets dumped illegally and nothing gets sorted shortcuts taken.